Prepared by
A Million Dreams, LLC

Website & Search Visibility Proposal

September 2026

Executive Summary

You don't give Google or AI enough information to work with.

So they describe you in vague terms, or pull from Yelp and LinkedIn instead.

Examples

What to do

  1. Put real numbers on the pages that don't have any.
  2. Build the pages you're missing, starting with rental.
  3. Write down who you are in a form machines can read.

None of this is complicated. It just takes time, and nobody has done it.

$10,000 Core fixes 5–6 weeks · paid 40 / 40 / 20
  • Ten service pages rewritten with capacities and specs (e.g. /shoring)
  • Dedicated scaffolding rental page (the one kind of search you're missing from entirely)
  • FAQ section
  • Credentials page (union status, certifications, badges as readable text)
  • Your name, address, phone, and services written in code so machines can read them
  • Technical cleanup (page titles, descriptions, image descriptions, mobile zoom, broken links)
  • Directory listings (Google, Yelp, LinkedIn, ZoomInfo)
  • Two project case studies (Vista Tower / St. Regis and O'Hare, or better 2023+ substitutes)
  • Current benchmark re-run (at kickoff, before work begins)
  • One audience-specific page (assumed: general contractors at prequalification)
  • Analytics and Search Console (installed day one, so there's something to measure against)
  • Launch verification and a 90-day results walkthrough (the same questions re-run against the same engines)

Short version. The full fifteen-line list, with what done means for each, is in what $10,000 covers.

Every one of the audit's 16 high-severity findings has a line in this scope that acts on it.

Everything below is here if you want it and ignorable if you don't.

01 — What $10,000 covers

Everything included, and what done means

This is the complete list. Fifteen lines, each with what finished looks like. Anything not on it isn't in the $10,000: follow-ups and add-ons are priced in what else this could cover; specific exclusions from this proposal are in what this doesn't fix. The small numbers on each item trace back to the audit.

  1. Analytics and Search Console installed Done: both installed and collecting, verified against a live test visit. This happens in week one, before anything else, because baseline data can't be recovered after the fact.
  2. Google Business Profile claimed and completed Done: profile claimed, verification submitted, and every field filled — hours, categories, service area, description, photos, service list. Google controls the verification timeline and usually confirms by postcard to 1510 Lunt Ave. Appearing in the map block itself isn't something anyone can promise. Findings 1.4, 1.5
  3. Ten service pages rewritten Done: each of the ten pages carries load capacities, dimensions, use cases and scope of supply that DEC's engineering department has confirmed. Anything engineering won't confirm doesn't get published, and I'll tell you which pages that affects. Findings 1.2, 1.3, 3.1, 3.3
  4. Dedicated scaffolding rental page Done: a page of its own, with its own URL and title built around rental — what's available, how renting works, terms, delivery and pickup, scope of supply. Finding 1.1
  5. FAQ section Done: published answers covering permits, rental minimums, insurance requirements, lead times, rent versus install, union labor, night and weekend work, custom fabrication, and safety certifications. Each answer reads correctly pulled out of context, which is how AI engines use them. Findings 3.4, 5.4
  6. Credentials and differentiators page Done: union signatory status stated plainly on a page of its own, alongside certifications, affiliations and safety credentials, and the footer badges given text that machines can read. Findings 3.5, 3.8
  7. Structured data Done: DEC's legal name, address, phone, founding year, services and service area published in a machine-readable format that validates without errors, plus the FAQ written the same way. This makes DEC's own site the clearest source about DEC and cuts the odds of another merge like the Gilco address. What Google chooses to write is still Google's call. Findings 2.1, 2.2, 2.3, 2.5, 4.1
  8. Technical cleanup Done: a unique title and description on every page; corrected heading structure; written descriptions on every undescribed image found (60+ confirmed, likely over 100 sitewide); pinch-zoom restored on phones; placeholder and broken links cleared; the services hub page rebuilt with real descriptions instead of ten bare links. Findings 3.6, 4.2 through 4.7
  9. Directory alignment Done: Google, Yelp, LinkedIn and ZoomInfo claimed where possible, corrected everywhere, and made consistent with each other and with the site. Findings 2.1, 2.4
  10. Two project case studies Done: two full technical accounts with figures throughout — what the site required, what DEC engineered, what DEC installed, how long it took, how it turned out. Recommended: Vista Tower / St. Regis and O'Hare; any project from 2023 forward that represents DEC better can be swapped in. The other six project pages stay as they are unless purchased as add-ons. Finding 3.2 — two of eight project pages
  11. Current benchmark re-run Done: the audit's question set re-run before work starts, so the 90-day comparison measures this project rather than the months since July.
  12. One audience-specific page Done: one page written for a single buyer audience — working assumption is general contractors at prequalification, subject to your confirmation. Covers how a project actually runs with DEC and what a GC needs to prequalify. Finding 3.9
  13. Sitemap and crawler file verification Done: both files checked directly from inside the site and corrected if wrong. These are the two files that tell Google which pages exist and which to skip. I couldn't check them from outside. Finding 4.8
  14. Launch verification one-pager Done: a written page confirming every deliverable live, structured data validating, and pages indexed by Google, with the audit's baseline restated for comparison. Written so someone with no involvement in the project can read it and forward it as-is.
  15. 90-day results walkthrough and AI re-test Done: the identical question set re-run against Google AI Overviews, ChatGPT and Perplexity, and a walkthrough with you comparing it to the benchmark. This is how we find out what moved. It isn't a promise that anything did — a site static since 2022 can take three to six months to show change.

Not included: anything not on the list above. The additions people usually ask about are priced in what else this could cover. What's excluded permanently is in what this doesn't fix.

What I need from you

Who handles each of these is your call. If it takes more conversations to get the information, we'll have them.

Timeline and payment (net 30)

Work completes 5-6 weeks from kickoff, contingent on the three calls happening inside the first three weeks and engineering data arriving soon after you request it.

MilestoneShareAmount
Kickoff40%$4,000
Launch: all pages live and verified40%$4,000
90-day results walkthrough20%$2,000

The final 20% is tied to the 90-day walkthrough so the follow-up stays a real commitment on both sides. That last milestone lands about four and a half months after kickoff — five to six weeks of build, then ninety days before the re-test is worth running.

SequencingHow the five to six weeks actually run

Week one issues every long-lead request at once: engineering load data, Google Business Profile verification, project figures, credential and insurance documents, and the current benchmark re-run.

Two case studies widen the engineering-data dependency, since project figures now come out of the same review cycle as the load capacities.

Everything that doesn't need DEC input runs in parallel: analytics install, technical cleanup, structured data (name, address, phone, and services written so machines can read them), competitive review, directory audit.

Items with external review cycles are the difference between a five-week project and an eight-week one.

Revisions. Two rounds per deliverable. I flag anything beyond before the work happens.

Scope changes. I raise anything that needs meaningfully more time than estimated before the work happens, not invoiced afterward.

↑ Back to top
02 — Deliverable detail

Line by line, if you want it

Each one expands, numbered to match the scope list above. Skip the whole section unless something up there needs justifying.

The audit. This proposal is built on the July 2026 Website & AI Search Visibility Audit, sent alongside it. Thirty-three findings across five groups, sixteen rated high severity. Finding numbers throughout this document refer to it.

Line 01Analytics and Search Console, day one

I install both before anything else, so data starts collecting immediately. Data has to start collecting immediately so the 90-day walkthrough has something to measure against, and so a deeper data-driven audit is possible later.

DEC has neither. You can't recover baseline data after the fact, so every week without them is a week you can't measure later.

Line 02Google Business Profile

Claimed, verified, completed: opening or operating hours, categories, service area, description, photos, service list.

Needed because nobody has claimed the profile and DEC never shows up in the three local businesses Google puts on a map (findings 1.4, 1.5).

Verification requires Google confirming the business at 1510 Lunt Ave, usually by a mailed postcard. I request that in week one.

Line 03Ten service pages rewritten

Scaffolding, swing staging, canopy, custom monorails, shoring, and the rest. Expanded from roughly 120 words into full pages including carrying load capacities, dimensional specifications, use cases, scope of supply, and other information I'll learn about from the engineers.

Search and AI tools quote pages that carry real figures; they skip or paraphrase pages without them (findings 1.2, 1.3, 3.1).

Ten thin pages don't match many search queries. Ten specification-dense pages match a much wider set, including the specific technical questions the audit showed DEC losing.

Dependency. Load capacities and structural specifications have to come from DEC's engineering department, and someone accountable for them has to sign off. Published load figures carry liability, and I won't publish anything engineering hasn't confirmed. This item depends on an external review cycle, which makes it the most likely to affect timeline. I'll request this in week one.

Line 04Dedicated scaffolding rental page

A page covering scaffolding rental as a service: what's available, how rental works, terms, delivery and pickup, scope of supply.

Rental exists only as a paragraph inside another page, so no title, URL, or heading targets the word (finding 1.1). This fixes a problem nothing else in the project touches.

Separate from the custom equipment rental page under what else this could cover, which covers standalone rental of DEC-manufactured equipment and is still unconfirmed. See Open Question 1.

Line 05FAQ section

Written answers to specific questions: permits, rental minimums, insurance requirements, lead times, rent versus install, union labor, weekend and night work, custom fabrication process, safety certifications.

Each answer stands alone and makes sense pulled out of context. That is how AI engines use this information.

The site has no FAQ content, while competitors and AI follow-ups show the gap this section closes (findings 3.4, 5.4). See Open Question 2 and Open Question 3.

Line 06Credentials and differentiators page

Union signatory status stated plainly, plus certifications, affiliations, and safety credentials. The footer badges (Iron Workers, SAIA, LiUNA Local One) are images only, so I'll add text machines can read (invisible to visitors).

Credentials sit buried or unreadable to machines today (findings 3.5, 3.8).

Line 07Structured data

Structured data means writing DEC's legal name, address, phone, founding year, services, and service area in a format machines can read. I'll also write the FAQ so each answer reads as a discrete response.

Technical term: JSON-LD (a common way to write that information in the page), using Organization, LocalBusiness, Service, and FAQPage schema types (named categories for that writing).

Needed so machines can identify DEC correctly instead of pulling identity from third-party listings or merging it with someone else (findings 2.1, 2.2, 2.3, 2.5, 4.1).

Lines 08 and 13Technical cleanup

I replace the repetitive sitewide duplicated content with unique titles and descriptions. I correct heading structure. I add alt text, which is a way of writing descriptions for images that machines can read, on undescribed images: 60+ confirmed, likely over 100 sitewide. I restore mobile pinch-zoom. I clear placeholder and broken links. I rebuild the services hub page with real descriptions instead of ten bare links. I verify sitemap and crawler files, which tell Google which pages exist and which to skip, directly.

These are the technical defects documented in findings 4.2 through 4.8. Machines and people don't read content correctly under a messy heading structure, regardless of how good the writing is.

Line 09Directory alignment

Google Business Profile, Yelp, LinkedIn, ZoomInfo. I'll claim where possible, correct everywhere, and make them consistent with each other and with the site. These are the four platforms with audit findings behind them (2.1, 2.2).

AI tools already read these listings to describe DEC (findings 2.1, 2.4).

Search engines cross-reference business details across platforms, so mismatches between these listings reduce confidence in all of them. This feeds directly back into item 07. Procore and The Blue Book profile expansion fall under the Catch Up Fully option.

Line 10Two project case studies

A full technical account covers what the site required, what DEC engineered, what DEC installed, how long it took, and how it turned out — with figures throughout.

Recommended pair: Vista Tower / St. Regis and O'Hare. The Vista Tower page already cites 700 linear feet of monorail and 12,000 man-hours; that is the depth these two pages are meant to reach. Any project from 2023 forward that represents DEC better can be swapped in. See Open Question 4.

Dependency. Project figures come out of the same engineering review cycle as the load capacities in line 03. I won't publish anything engineering hasn't confirmed.

Lines 14 and 15Launch verification and 90-day re-test

Two pieces rather than one report.

At launch: a written one-pager. Every page live, structured data validating, pages showing up in Google (indexed), with the audit's baseline restated for comparison. A Million Dreams-branded and written so someone who had no involvement in the project can understand it and forward it as-is, if desired.

At 90 days: results walkthrough and AI re-test. A re-run of the identical question set from the audit against the same engines it tested: Google AI Overviews (the AI answers that appear at the top of some Google searches), ChatGPT, Perplexity. Running the same questions against the same engines is what makes the comparison mean anything. Testing earlier would be less effective, because there's no guarantee those systems will have re-crawled meaningfully by 30 days.

An updated site that sat static since 2022 can take three to six months to show changes in search rankings and AI citations.

ApproachPublishing pricing structure without publishing prices

A competitor's FAQ states its model plainly: they calculate cost per piece, state a minimum rental cycle, then bill per day after that. No dollar figure anywhere. AI engines extract and quote that line, and it costs that competitor nothing competitively.

DEC's version would cover structure only:

  • Minimum rental periods and how the cycle runs
  • What a full install includes versus rental-only
  • Delivery, pickup, and site logistics, and who handles what
  • What changes a quote: height, duration, permits, night or weekend work, union labor, custom fabrication

No margins, no rate cards, no line-item bid sheets.

Job figures work the same way: tons of steel erected, maximum working height, total man-hours. DEC already publishes this kind of figure on the Vista Tower page. See Open Question 5.

↑ Back to top
03 — Limits

What this doesn't fix

The freshness problem comes back. A one-time rewrite resets the clock on June 2022. It doesn't keep the clock moving, and this project can't solve that on its own. An ongoing content arrangement is out of scope here.

If your crews already produce jobsite photography, posting at least one project update a month to the site keeps freshness signals alive between larger improvements.

Excluded by design

Available separately, later, or in a maintenance contract

↑ Back to top
04 — Beyond the $10,000

What else this could cover

The $10,000 gets the site current and acts on all 16 high-severity findings. Everything below is additional. The audit surfaced content this market hasn't published and search and AI systems would reward.

Add Pages $700 Per case study or audience page
  • Additional case studies beyond the (2) included
  • Additional audience pages beyond the (1) included
More info.

Additional case studies. Same full technical account as the two in Core Fixes: what the site required, what DEC engineered, what DEC installed, how long it took, how it turned out. Figures throughout. Any project beyond those two qualifies. Depth follows available documentation — projects with photos and figures on hand get the full account; others get whatever can be rebuilt from what you provide. See Open Question 4 for the included second project.

Additional audience pages. Worth building only if DEC actually sells to those audiences differently. The first audience page is included in Core Fixes; see Open Question 9.

Catch Up Fully $5,000 Backing up what DEC already claims
  • Swing stage vs. scaffolding comparison
  • Manufacturing & capability page
  • Equipment available for rent (see Q1)
  • Rebuild the menu and page links
  • Procore and Blue Book profile expansion
More info.

"Swing Stage vs. Scaffolding" comparison page. Which system suits which conditions: building height, facade type, duration, access constraints, cost profile, crew implications. Perplexity listed this comparison as one of its own suggested follow-up questions about DEC, and no company in this market has published a strong version. DEC manufactures and installs both systems, which few competitors do. AI engines also cite comparison content at a higher rate than promotional content, because it's structured as a decision.

Manufacturing and capability page. What's fabricated in-house, capacity, tolerances, turnaround on custom work. The audit rated manufacturing capability as claimed but never substantiated: no specifications, no capacities, no fabrication detail anywhere on the site.

Rebuild the menu and how pages link to each other. Every page, old and new, restructured so people and search engines can move through the site. This is the direct answer to the clutter concern about competitor sites, since a large site with disciplined structure reads differently than one without it. It's also the hardest item to retrofit after a rebuild, which makes it worth deciding early.

Equipment and systems available for rent. The fleet itself, with capacities, dimensions, and configurations for each system available on a rental basis. This is the load-capacity question answered in published form: the single question the audit showed DEC losing outright. Separate from the rental process page in the $10,000, which covers how renting works rather than what's available.

Procore and Blue Book profile expansion. Beyond the accuracy corrections in Core Fixes. These are construction-industry platforms, and The Blue Book already appears in DEC's own footer. Expansion means fuller profiles that trade buyers actually use, not just name and address fixes.

Lead the Pack $2,500 Known questions not yet answered online
  • Chicago permits explainer
  • Service area & jurisdiction differences
  • Working With DEC explainer
More info.

Pages targeting questions currently unanswered.

Chicago permits explainer. Height and duration thresholds, fees, insurance requirements, timelines. Frequently searched and frequently answered by AI engines. Government sources usually own the direct answer, but a supporting citation is realistic.

Service Area and Jurisdictions page. Municipalities DEC serves and how permitting differs across them, with completed projects as supporting detail.

Worth explaining, since this departs from the audit. The audit noted a competitor running eight location pages Google has found and stored (indexed) against DEC's zero. Those eight are near-duplicates with the municipality name swapped. Google has been filtering out thin copy-paste pages like that for well over a decade, so their existence proves someone published them, not that they work. It's also the pattern behind the clutter objection. One substantive page covering jurisdictional differences answers the same search intent without the filler.

"Working With DEC": a contractor-facing page. How a project actually runs: assigned project manager, site walks, ongoing consultation. Plus what a GC needs at prequalification: union labor, insurance thresholds, safety record, scheduling. The audit flagged that nothing on the site describes either. Whether that process is worth publishing, and what it actually is, is your call.

Bundle Combo $6,500 $1,000 less than separately
  • Everything in Catch Up Fully and Lead the Pack
  • Priced together because of shared research and interview time

Both figures assume an included equipment rental page. Open Question 1 decides that.

↑ Back to top
05 — Open questions

Things only you can answer

Several of these change scope. No need to write anything down; we can go through them on the first call.

#Question
1Is DEC-manufactured equipment available for standalone rental? If so, how is cost calculated, is there a minimum rental period, and who handles delivery and pickup? Determines whether the custom equipment rental page applies at all. Separate from standard scaffolding rental, which is already covered.
2Beyond union signatory status, what credentials come up during pre-qualification? Safety ratings, EMR, certifications, insurance thresholds, association memberships.
3Does DEC offer equipment training, or handle historic restoration? Both surfaced as questions AI tools generated about DEC. The site answers neither. If either is a real capability, it's content worth having.
4Which second project for the included case studies? Vista Tower / St. Regis is the recommended first. Is O'Hare the right second, or does anything from 2023 forward represent DEC better?
5Are structural figures available for other projects? Tons of steel, maximum working height, man-hours. Vista Tower already publishes figures of this kind. Question is whether equivalent numbers exist elsewhere, and whether anything shouldn't be published.
6Who owns engineering data, and can I be introduced? Load capacities and structural specifications need to come from someone accountable for them. Most likely item to affect timeline, so worth resolving in week one.
7Does quality photography of the manufacturing facility exist outside of Instagram? Relevant to Catch Up Fully.
8Does Activate Hype still hold anything DEC doesn't have direct access to? Theme files, hosting, DNS.
9Which audience should the included audience-specific page target? Working assumption is general contractors at prequalification. Confirm or adjust.
↑ Back to top
06 — Next

That's the whole thing

Call me and say go, and we'll figure out a kickoff date and the first call slot. Or if you have any questions, let me know and I'll answer them.

415-439-3164